:  Jul 14, 2004



. Evacuate the A/C system.

. Remove the instrument panel upper section.

.
  : Immediately cap all refrigerant lines to prevent ingress of dirt and moisture.

Remove the thermostatic expansion valve.
  Remove the cover.
  Remove the 2 Allen bolts.
  Remove and discard the 4 O-ring seals.




. Install the thermostatic expansion valve.
  Clean the components.
  Install the new O-ring seals.
  Tighten the Allen bolts to 5 Nm (4 lb.ft).
  Install the cover.

. Install the instrument panel upper section.

. Recharge the A/C system.